Multi-storey steel buildings

 We design all kinds of multi-storey buildings the core bearing system of which has fully steel or reinforced concrete-steel systems with mixed, composite systems or SAYPOST-BEAM elements. We are producing solutions for buildings from 1-2 floors to high-rise skyscrapers. Moreover, our steel experience is not only with the main bearing system, but we also offer execution-wise specific facade solutions, special entrance floors canopy-atriums and Freeform-architectural steel floors.
In general it is considered that basement floors are reinforced concrete, entrance and upper floors should be steel. However, this is economically and statically not very convenient. It is rather difficult to connect the steel columns to the floor level so that they stay in the screed, but anchored connection will not be suitable. Moreover, the crew and equipment that should be brought for the basement floors will eliminate the advantages of steel construction. From the foundation the use of the steel column-beam system solves all possible problems. In the basement floors of the steel structure The contact with the soil and the danger of corrosion are solved easily with the parts, made during the design phase.
The risk of corrosion and fire is not greater for steel structures than for reinforced concrete structures. Measures against these factors are being taken economically in today's conditions. Especially technical support is provided for the economic resolution of fire measures. Composite and SAYPOST steel beams have no disadvantages in vibration, deflection and fire safety, which are the usual main prejudice.
Urban transformation under SAYCON brand, suitable for fast hotel-hospital-school-dormitory investments fast and economical steel structure solutions are offered.
In addition to standard solutions, SAYPOST BEAM & COLUMN - prestressed mixed beam and column system provides economical solutions for multi-storey structures. Especially in tower type high-rise buildings, wide floor spans are passed without the need for additional column between the core and facade system. Mechanical-Ventilation-Fire-Electric installations are solved in the beam plane by means of the spaces left in the bearing system system. We make it easy to offer alternative solutions that can be changed over time, in line with your sales-marketing strategy, with the same height, without column, and with the wiring system that can be reached from any desired point.
With our ROBOTOO and SAYPOST solution group, we produce technical data which will help you to choose between classic parking solutions and Robotics or SAYPOST parking solutions.
As SAY PROJECT, we perform advanced static calculations with PERFORM ANALYSIS - F.E.M ANALYSIS METHODS for SAFE resettling after major earthquake envisaged other than the current earthquake regulations. SAY PROJE and İ.T.Ü together provide earthquake monitoring service.